A covered canal along 420 metres of Daang Hiyas, so rain runs to the river instead of flooding the road in front of the school. The western half is finished.
Drainage canal along Daang Hiyas
A covered canal along 420 metres of Daang Hiyas, so rain runs to the river instead of flooding the road in front of the school.